Project Description

Our remit was to carry out the refurbishment of the ex- isting Pharmacy Drive Through, inclusive of the erection of an extension. We were supplied a basic specification and a time frame of 30 days.

The scope included the removal of all M & E services, the strip out of the existing facility to include, fixtures, fittings, walls, ceilings, flooring and even an asbestos containing window set, where the new extension was to adjoin the existing building.

The strip out and the removal of the window was the first course of action, as the window removal provided us with access to our work area, without having to transit through the hospital.

With the strip out underway, the existing disabled car parking spaces were shut off, to accommodate the ground works, prior to the erection of the extension. Initially we also had to adapt a fire exit staircase, by reversing the stair access.

The block work to the extension then began in conjunction of the first fix M & E, inclusive of new lighting, dado rail electrics, data sockets, air conditioning, plumbing and fire & security control installation.

To ensure there was not any delays, we then had to ar- range for new windows and doors to be fabricated and even arranged for the window blinds to be manufactured.

The works continued for the duration of the 30 days, work- ing weekends and long days.

On the 30th day we handed over the refurbished New Drive Through Pharmacy Department, inclusive of the new extension to a very happy client

Scope of work

• Removal of asbestos containing window set
• Soft strip exiting Pharmacy Drive Through department
• Removal of all M & E services
• Relocate stairs for fire escape
• Ground works to prepare for extension
• Erection of access scaffold
• Erection of blockwork extension
• Installation of new windows, external and internal doors
• Supply and install new servery hatches
• Install fire stopping
• Fit new suspended ceilings throughout
• Install secondary fix to all M & E services
• Decorate existing department and new extension
• Install full height “white rock” walls to existing pharmacy
• Block off doorway to original consultancy room
• Latex and lay new flooring vinyl throughout
• Install Corian worktops and shelving
• Supply and fit new blinds to all windows
• Fabricate ramp access to new extension to include handrail
• Refurbish bollards and relocate

Project Gallery

Key Achievements

Redbridge Construction Ltd completed the works within the 30 days as requested. All works were carried out while the Out Patients Department was fully operational. The project was completed without any additional costs and on budget.